MOSUL TIME RADIO
The Governor of Nineveh, Abdul Qadir Al-Dakhil, confirmed that the situation in the Mosul Dam is safe and that there are no risks threatening it at the present time. During his visit to the dam project and his meeting with his engineering and technical staff, Al-Dakhil indicated that grouting work will continue to secure the walls of the dam, indicating that the current situation is reassuring and that there are no risks as rumored. On social networking sites.
For his part, the director of the Mosul Dam Project, Hatem Tayyab Fathi, sent a message of reassurance to the people of Nineveh that the Mosul Dam is safe and operating normally, with the continuation of sealing and monitoring of the dam. Fathi explained that the dam is not witnessing any problems in storing water, calling on the people not to listen to rumors that talk about the existence of Risks threatening the collapse of the dam.