MOSUL TIME RADIO

Nineveh Governor Abdul Qader Al-Dakhil revealed that the Nineveh local government is taking steady steps to complete our government program that is consistent with the federal government and the aspirations of the people of the province .

He stressed that the ring road is one of the important and strategic projects for the city of Mosul and the entire Nineveh Governorate , indicating that the first phase of the ring road consists of 3 sections , and that the first section extends from Dohuk Road to the Sixth Bridge and has been completed by more than 85 % .

He explained that the length of the first section is (8 km) and consists of a main street with two lanes, a bridge and a bridge over the Tigris River , revealing a meeting soon with the Minister of Construction in order to refer the second section extending from the sixth bridge to Tal Afar Road, passing through Al-Mahalabiya and reaching Baghdad Road .

During his visit to the ring road project site and his inspection of the progress of work, Al Dakhil followed up on the progress of work. that The circular road will preserve the streets of Mosul city , as trucks coming from Turkey, Dohuk and the provinces of the region will take this road directly to the Baghdad road , indicating that the circular road will create job opportunities on both sides of the road and revive economic activity in the city of Mosul .

Al Dakhil concluded that the clip the third For the project The road The yearly extends from road Baghdad Passing by In the village The Bossif Arriving to The Bridge Seventh And to road Kirkuk.